MOT Type 1 Sub-Base Guide
MOT Type 1 is a graded crushed-stone sub-base used under driveways, paths and patios. To calculate the quantity, multiply the area in m² by the compacted depth in metres to get the volume in m³, then multiply by a compacted density of about 2.0 tonnes per m³.
For a 30 m² driveway at 150 mm compacted depth: volume = 30 × 0.15 = 4.5 m³, and tonnage = 4.5 × 2.0 = 9.0 tonnes. Add 5–10% wastage for compaction and spreading losses.
The MOT Type 1 Calculator below converts area and depth into tonnes, bulk bags and 25 kg bags in one step.
The formula
Tonnes = Area (m²) × Compacted depth (m) × 2.0 × (1 + wastage %)
2.0 t/m³ is a typical compacted density; order for the compacted volume.
Worked examples
Driveway sub-base
- Driveway 5 m × 6 m = 30 m².
- Compacted depth 150 mm = 0.15 m.
- Volume = 30 × 0.15 = 4.5 m³.
- Tonnes = 4.5 × 2.0 = 9.0 tonnes.
- With 10% wastage: 9.0 × 1.10 = 9.9 tonnes.
Order about 10 tonnes of MOT Type 1.
Patio sub-base
- Patio 4 m × 3 m = 12 m².
- Compacted depth 100 mm = 0.10 m.
- Volume = 12 × 0.10 = 1.2 m³.
- Tonnes = 1.2 × 2.0 = 2.4 tonnes.
- With 5% wastage: 2.4 × 1.05 = 2.52 tonnes.
Order about 2.5–3 tonnes of MOT Type 1.
Step-by-step method
1. Measure the area in m² (length × width). For irregular shapes, split into rectangles and add them.
2. Choose the compacted depth: 100–150 mm for patios and paths, 150–200 mm for driveways carrying vehicles.
3. Multiply area × compacted depth to get the compacted volume in m³, then multiply by 2.0 t/m³ for the tonnage.
4. Add 5–10% wastage for spreading and compaction losses, then round up to the nearest tonne or bulk bag.
5. Compact in layers of 50–75 mm with a vibrating plate, building up to the full depth rather than compacting one thick layer.
Typical depths and where to use them
Patios and paths (foot traffic only): 100 mm compacted is standard. Use 150 mm on soft ground or where heavy features will sit on the patio.
Driveways (domestic cars): 150 mm compacted. For heavier vehicles, poor ground or commercial use, increase to 200 mm.
Always compact in layers. A single thick layer will not compact fully at the base, leaving a soft spot that settles later. Lay each layer, compact it, then add the next.
Measurement and unit conversion
Work in metres: convert millimetres by dividing by 1000 (so 150 mm = 0.15 m), centimetres by 100, feet by 0.3048 and inches by 0.0254.
MOT Type 1 is sold by the tonne for loose loads or by the bulk bag (roughly 0.8–1.0 m³) for smaller quantities. Order based on the compacted volume you need — loose Type 1 compacts by about 30–40%, so the loose volume is larger than the compacted volume.
The 2.0 t/m³ figure is a typical compacted density. Actual density varies with moisture and grading, so confirm with your supplier for a tighter tonnage.
Recommended wastage considerations
Allow 5% for straightforward rectangular areas and 10% for irregular shapes, sloping ground or where the sub-base is hand-spread. Wastage covers spreading losses, uneven excavation and material left at the edges.
Because Type 1 compacts, order for the compacted volume plus wastage — not the loose volume. The calculator already works on the compacted depth you enter.
Common mistakes to avoid
Ordering the loose volume instead of the compacted volume, which leaves you short after compaction.
Compacting the full depth in one layer rather than in 50–75 mm lifts, leaving the base under-compacted.
Laying Type 1 without a geotextile membrane on soft ground, so the stone mixes with the subsoil and the base weakens.
Skimping on depth to save material, which leads to rutting and settlement under load.
Ordering and supplier guidance
Loose tipped loads are cheaper per tonne but need delivery access and a place to tip. Bulk bags suit smaller jobs or sites with restricted access.
Confirm the actual grading and density with your supplier — MOT Type 1 should be a well-graded crushed rock or limestone that compacts to a firm, free-draining base.
Schedule delivery so the Type 1 is spread and compacted soon after arrival. Leaving a loose pile exposed to heavy rain softens the ground beneath and makes compaction harder.
Safety and estimates
All quantities here are estimates based on a typical compacted density of 2.0 t/m³. Real requirements vary with ground conditions, moisture and grading, so confirm the final tonnage with your supplier before ordering.
Operating a vibrating plate compactor is tiring and can cause hand-arm vibration issues over long periods — take regular breaks, wear gloves and consider rotation between operators. Keep children and pets clear of the working area.
Frequently asked questions
All quantities on this page are estimates based on standard dimensions and densities. Real requirements vary with site conditions, material specifications and workmanship. Confirm quantities with your supplier or tradesperson before ordering. See our disclaimer for details.
Use the MOT Type 1 Calculator
Skip the manual maths — enter your dimensions into the MOT Type 1 Calculator and get an instant estimate with a wastage allowance built in.
Open the MOT Type 1 Calculator