Use this aggregate calculator to estimate how much aggregate you need from the area and depth of your project. It works as a general material calculator for gravel, sharp sand, crushed stone, limestone and topsoil — answering 'how much aggregate do I need' in tonnes and bulk bags, in metric or imperial.

Enter your project details

m²
mm

Sub-base: 75–100 mm

%

Recommended: 5–10%

Aggregate required

Estimated weight (incl. wastage)2.36tonnes
Volume (incl. wastage)1.58m³
Volume in cubic feet55.6ft³
Volume before wastage1.5m³
850 kg bulk bags3bags

Based on a density of 1.5 tonnes per m³. Compacted sub-bases may need 10–20% extra — increase the wastage allowance if compacting.

Results are estimates only. Confirm quantities, material densities, pack sizes, product yields and specifications with your supplier or tradesperson before ordering. See our disclaimer for details.

How the calculation works

The calculator multiplies your area by the depth to find the volume of material needed. Areas entered in square feet and depths in inches are converted to metric automatically, so the result is always consistent.

Volume is then converted to tonnage using a typical bulk density for the material you selected — for example gravel and limestone average around 1.5 tonnes per cubic metre, sharp sand and crushed stone around 1.6 t/m³, and topsoil around 1.3 t/m³.

A wastage allowance is added for compaction, settlement and spillage. For compacted sub-bases such as MOT Type 1, consider increasing the allowance to 10–20%, as the material compacts significantly when whacked down.

Worked example

A patio sub-base covering 20 m² at 75 mm deep, using crushed stone with 5% wastage:

  1. Convert depth: 75 mm = 0.075 m
  2. Volume = 20 m² × 0.075 m = 1.5 m³
  3. Add 5% wastage: 1.5 × 1.05 = 1.58 m³
  4. Weight = 1.58 m³ × 1.6 t/m³ = 2.52 tonnes

You would need roughly 1.6 m³ of crushed stone — about 2.5 tonnes, or 3 bulk bags.

Practical guidance on wastage

Add 5–10% for loose aggregates like gravel and decorative stone. Compacted sub-bases such as MOT Type 1 can lose 20% or more of their loose volume when whacked down, so increase the wastage allowance to 10–20% for sub-bases, or enter the compacted depth and add a generous margin. Wet material weighs more and settles differently, so confirm the density with your supplier.

Common unit conversions

  • 1 m² at 50 mm depth0.05 m³ of aggregate
  • 1 m² at 75 mm depth0.075 m³ of aggregate
  • 1 cubic metre of gravel / limestone≈ 1.5 tonnes
  • 1 cubic metre of sharp sand / crushed stone≈ 1.6 tonnes
  • 1 cubic metre of topsoil≈ 1.3 tonnes
  • 1 cubic metre35.31 ft³ / 1.31 yd³
  • 1 bulk bag (850 kg)≈ 0.5–0.6 m³

Frequently asked questions