Ready Mix Concrete Calculator
Calculate how much ready-mix concrete to order with this ready mix concrete calculator. Enter your pour dimensions in metric or imperial, add a wastage allowance, and get the total volume in cubic metres and cubic yards — plus an estimate of how many concrete lorry loads you will need based on a typical lorry capacity you can adjust.
Enter your pour dimensions
Typical slab: 100–150 mm
Recommended: 10%
Standard ready-mix lorry ≈ 6 m³. Adjust to match your supplier’s truck.
Ready-mix concrete required
Lorry-load estimate assumes a 6 m³ carrying capacity. Capacities vary by vehicle and supplier — confirm with your provider. Round up when ordering.
Results are estimates only. Confirm quantities, material densities, pack sizes, product yields and specifications with your supplier or tradesperson before ordering. See our disclaimer for details.
How the calculation works
Concrete volume is calculated as length × width × depth. The calculator converts your depth from millimetres or inches into metres automatically, then multiplies the three dimensions to give the volume in cubic metres (m³).
Ready-mix concrete is normally ordered in cubic metres because that is the unit suppliers batch and deliver in. For international users the result is also shown in cubic feet (1 m³ = 35.31 ft³) and cubic yards (1 m³ = 1.31 yd³).
A wastage allowance is then added on top to cover uneven excavation, spillage and over-pour. Ten per cent is standard for slabs and footings; you can adjust it to suit your pour.
Finally, the adjusted volume is divided by the assumed lorry capacity to estimate how many deliveries you will need. A standard ready-mix lorry commonly carries around 6 m³, but capacities vary — use the lorry capacity field to match your supplier’s vehicle.
Worked example
A driveway slab 4 m long, 3 m wide and 150 mm deep, with 10% wastage and a 6 m³ lorry:
- Convert depth: 150 mm = 0.15 m
- Volume = 4 m × 3 m × 0.15 m = 1.8 m³
- Add 10% wastage: 1.8 × 1.10 = 1.98 m³
- In imperial: 1.98 m³ × 1.31 ≈ 2.59 yd³
- Lorry loads: 1.98 ÷ 6 = 0.33 → round up to 1 load
You would order roughly 2 m³ of ready-mix concrete — a single lorry load on a standard 6 m³ truck.
Practical guidance on wastage
Ten per cent is the standard wastage allowance for slabs and footings, covering uneven excavation, spillage and over-pour. Excavations are rarely perfectly level, so the actual depth often varies from the planned depth — a small allowance protects against running short. Running out mid-pour creates a weak cold joint between batches, so it pays to order slightly too much. Ready-mix is usually rounded up to the nearest quarter or half cubic metre, and most suppliers apply a minimum order charge below a certain volume — confirm that threshold with your supplier.
Common unit conversions
- 1 m² of slab at 100 mm thick0.1 m³ of concrete
- 1 m² of slab at 150 mm thick0.15 m³ of concrete
- 1 cubic metre of concrete35.31 ft³ / 1.31 yd³
- 1 cubic yard0.765 m³
- Standard ready-mix lorry≈ 6 m³ (varies by supplier)
- 1 m3.281 ft