Guide
How to Calculate Concrete for a Slab
To calculate concrete for a slab, multiply the length by the width and by the depth — all in metres — to get the volume in cubic metres (m³). A 4 m × 3 m slab at 100 mm thick needs 4 × 3 × 0.10 = 1.2 m³ of concrete before wastage.
Add a 5–10% wastage allowance for spillage, over-excavation and an uneven sub-base, then round up to the nearest practical delivery size. For larger pours, ready-mix concrete is usually cheaper and more consistent than mixing by hand.
The Concrete Calculator below works out the volume in m³, cubic feet and cubic yards from a single set of dimensions, with a wastage field built in.
The formula
Volume (m³) = Length (m) × Width (m) × Depth (m) × (1 + wastage %)
Convert all dimensions to metres before multiplying.
Worked examples
Garden shed base
- Slab 3 m × 2.5 m, depth 100 mm (0.10 m).
- Volume = 3 × 2.5 × 0.10 = 0.75 m³.
- With 10% wastage: 0.75 × 1.10 = 0.825 m³.
Order about 0.85 m³ of concrete.
Patio slab measured in feet
- Slab 10 ft × 8 ft, depth 4 in.
- Convert: 10 × 0.3048 = 3.05 m, 8 × 0.3048 = 2.44 m, 4 × 0.0254 = 0.102 m.
- Volume = 3.05 × 2.44 × 0.102 = 0.76 m³.
- With 5% wastage: 0.76 × 1.05 = 0.80 m³.
Order about 0.8 m³ of concrete.
Step-by-step method
1. Measure the slab length and width in metres. For an irregular shape, split it into rectangles, calculate each volume and add them together.
2. Decide the slab depth in metres. The following figures are general examples only, not structural recommendations: around 100 mm (0.10 m) for paths and shed bases, 125–150 mm for patios and light-use areas, and 150–200 mm for driveways carrying vehicles. The correct depth depends on the load, ground conditions and intended use.
3. Multiply length × width × depth to get the volume in m³. This is the net concrete required before wastage.
4. Add 5–10% wastage to cover spillage, over-dig and an uneven sub-base. Multiply the volume by 1.05–1.10.
5. Round the calculated quantity up according to the delivery increments offered by your chosen supplier. Minimum orders, part-load charges and available increments vary, so confirm them before ordering.
Measurement and unit conversion
Always work in metres for the calculation. Convert centimetres by dividing by 100, millimetres by 1000, feet by multiplying by 0.3048, and inches by multiplying by 0.0254.
To convert the finished volume: 1 m³ = 1000 litres = 35.315 cubic feet = 1.308 cubic yards. Ready-mix suppliers quote by the cubic metre, so the m³ figure is the one to use when ordering.
Depth is the dimension most often mis-entered. A slab "100 mm thick" is 0.10 m — entering 100 as the depth gives a volume 1000 times too large, so convert millimetres to metres first.
Recommended wastage considerations
Allow 5% for clean, rectangular pours onto a levelled base, and 10% where the ground is uneven, the shape is irregular, or you are hand-mixing, where spillage and over-mixing are higher.
Wastage also covers the concrete that stays in the mixer, pump or barrow at the end of the pour. It is far cheaper to order a small surplus than to run short and wait for a top-up delivery, which can leave a cold joint between two pours.
Common mistakes to avoid
Entering the depth in millimetres instead of metres — the single most common error, and it inflates the volume a thousandfold.
Forgetting to add wastage, then running short mid-pour. A cold joint between two pours is weaker and more visible.
Measuring the slab area but forgetting to allow for the depth of the excavation, so the pour comes up short.
Ordering exactly the calculated volume with no rounding, when ready-mix is supplied in minimum loads and part-load steps.
Ordering and supplier guidance
For pours of roughly 1 m³ or more, ready-mix concrete is usually more economical and consistent than bagged cement and ballast. Ready-mix minimum orders and part-load increments vary by supplier, so confirm the minimum load, part-load charge and delivery access with your supplier before ordering.
For smaller pours, buy bagged cement and ballast (or a dry all-in mix) and mix on site. Bagged-concrete yields vary by product. Check the manufacturer’s stated mixed yield in litres and divide the required volume in litres by that yield. For example, if a 25 kg bag produces approximately 12 litres, one cubic metre would require about 84 bags before wastage. Do not confuse bags of cement with bags of complete premixed concrete.
Have the site fully prepared — formwork, sub-base, reinforcement and access — before the delivery arrives. Ready-mix has a limited working time from the batching plant, so the pour needs to start promptly.
Safety and estimates
All volumes here are estimates based on nominal slab dimensions. Real concrete requirements vary with sub-base level, formwork accuracy, spillage and ground conditions, so confirm the final quantity with your supplier or contractor before ordering. The slab-depth figures given are general examples only, not structural recommendations — confirm load-bearing slabs, foundations and vehicle areas with an appropriately qualified professional.
Wet cement and concrete are caustic — wear gloves, eye protection and long sleeves, and wash any skin contact immediately. Avoid over-exertion when handling heavy loads, and ensure the excavation is safe and supported before pouring.
Frequently asked questions
All quantities on this page are estimates based on standard dimensions and densities. Real requirements vary with site conditions, material specifications and workmanship. Confirm quantities with your supplier or tradesperson before ordering. See our disclaimer for details.
Use the Concrete Calculator
Skip the manual maths — enter your dimensions into the Concrete Calculator and get an instant estimate with a wastage allowance built in.